We offer a sectoral research report for renewable energy projects that you want to invest in. We keep the legislative changes updated. We regularly share the tables that show the total installed power, the total installed power and the proportional distribution of the generated energy to the generation resources, published by TEIAS. We evaluate investment opportunities within the scope of strategic planning.
If you have a production facility but do not have the space to establish a Solar Power Plant, we are developing a project area that is strong enough to meet your electricity consumption needs in any region of Turkey. We obtain all the necessary permits for the project area on your behalf and make them ready for investment.
We are evaluating for Renewable Energy Resource Areas (YEKA) published by TEİAŞ to be allocated for renewable energy. We support your company during the competition process.
We communicate with companies that establish production facilities with financial support, evaluate the proposals in line with the project area and your needs, and follow the installation process.
We prepare a Project Introduction File for the project stakeholders by examining your project site or roof area on-site and making technical evaluations.
Following the project site review, we conduct a preliminary survey summary study based on the preliminary settlement study. Alternative brands are specified in the exploratory work.
We contact the suppliers in the sector for alternative materials with the technical details specified in the project preliminary discovery study, and we get material stock controls, delivery dates and price information. We share all alternatives transparently with the investor.
We determine the project budget by making a preliminary discovery summary and technical and financial evaluation of selected materials according to investor preferences. We calculate the payback period of the project with the budget and investment stage cash flow table. If you make an investment in a generation plant with the self-consumption model, we analyze your past electrical consumptions or future consumption targets to determine the most suitable capacity for your factory and report it.
After the site investigation was made, the preliminary survey summary and the appropriate material selection were completed, the relevant Elektrik Dağıtım A.Ş. We draw the General Layout Plan, Single - Line Diagram and Grounding projects to be approved by the Ministry of Energy and Natural Resources. If requested, we obtain static approval from universities for the construction infrastructure to be used in the project within the scope of the mechanical project.
According to the layout and material selection made on your project site or roof area, we perform the production simulation on an annual basis through the analysis program.
We are applying for a Letter of Invitation on your behalf. We manage the processes of drawing and approving projects with a call letter. Afterwards, we manage the Connection Agreement process with approved implementation projects. All these processes take into account the periods in the relevant legislation.